How to price concrete resurfacing jobs is the question that sits behind most of the marketing questions owners ask us. You can get a good flow of enquiries and still go backwards if every quote is shaved to win the job. The opposite happens too: a price set high out of habit, on a quote that arrives three days late. This post walks through building a price from your real costs, how to present it, and where the cost of getting leads belongs in the sum.

Start with the true cost of the job

Before you think about what a competitor charges, write down what the job costs you to deliver. Include:

  • Materials, including the primer, the overlay or spray-on coat and the sealer.
  • Labour for prep, application and clean-up, counted at what your crew costs you, not what you hope.
  • Surface prep time. Grinding, crack repair and cleaning are where jobs blow out.
  • Equipment, fuel, disposal and travel to site.
  • A share of overheads such as insurance, vehicles, software and your own wage.

Plenty of owners underprice prep because the finished surface is the part they remember. A quick site check and a few photos of the existing slab before you quote will save you from absorbing a day of extra grinding.

Add margin, then the cost of winning the job

The next layer is profit, and then the cost of marketing. The ABS reported in Characteristics of Australian Business 2024-25, released on 25 June 2026, that 30% of businesses felt cutting margins to stay competitive had significantly held back their general activity. The figure was 21% in 2021-22. That figure covers all industries, but any trade that gets compared on a single number will recognise the squeeze.

Marketing belongs in your price, not just in your budget. Work out what you spend on ads and follow-up in a month, divide by the jobs you win, and you have a cost to win each one. For scale only: our Melbourne epoxy campaign screenshot shows 38 leads at $19.31 each on $733.75 of spend. Those are lead counts for an epoxy campaign, not resurfacing jobs or revenue. Cost per lead is only half the sum. Divide it by the share of leads you convert and you get the real cost per job. We cover that in our post on cost per lead.

Check the number against the market

Once you have a floor, check what local buyers expect. Look at competitors' public prices and the quotes you have lost, and ask customers how yours compared. You do not need to be the cheapest. You need a price you can defend with your proof and your process.

If you sit above the middle, you need reasons: clear prep, a warranty you can honour, photos of similar jobs and reviews. If you sit below, ask whether you are leaving margin on the table that you could use to pay for better marketing.

Present the quote so it is easy to say yes to

Buyers compare what is easy to compare, and that is usually the total. A quote that spells out what is included gives them something else to weigh. Include:

  1. The area, the surface type and the finish you will apply.
  2. What prep is included, and what happens if the slab has problems you could not see.
  3. Timing, curing and when the surface can be used.
  4. Payment steps and any deposit.
  5. A date the quote is valid until.

Send it quickly. Our guide to following up quotes covers why the first few days decide a lot. Put the same detail on a landing page so the quote matches what the ad promised, as we do in our landing pages for flooring and coatings businesses.

Know the contract rules where you work

Pricing is not only arithmetic. The paperwork around it affects what you can ask for and when.

Rules differ by state and by the type of work. Legal Aid NSW, in a page last updated in March 2026, says residential building work over $5,000 needs a written contract, that deposits are capped at 10% of the contract price in most cases, and that licensed contractors should do the work. Whether your resurfacing jobs count as residential building work, and how thresholds apply in your state, is a question for the regulator or your adviser. Write your quotes and contracts with that in mind, rather than assuming a handshake is enough.

Win on more than price

In the CobbleCrete case study, the Sydney decorative concrete and coatings owner said part of what changed was getting the right type of jobs, not whatever came through. It is a pricing lesson too. If your marketing pulls in better-fitting jobs in a tighter area, you quote with less travel and fewer surprises. You can see how other firms present their numbers on our results page, and the resurfacing landing pages explains how we build the enquiry flow behind it.